ug610登陆(www.ugbet.us):Stop musang king planting project in Gunung Inas, says Baling MP

a55555彩票网www.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

Abdul Azeez Abdul Rahim says he has submitted a memorandum objecting to the musang king durian planting project in Gunung Inas to Kedah’s menteri besar. – The Malaysian Insight file pic, July 5, 2022.

THE musang king durian planting project in Gunung Inas, which is alleged to be one of the causes of floods and the water surge phenomenon that hit several villages in the Baling district yesterday afternoon, must be stopped.

Baling MP Abdul Azeez Abdul Rahim said he had previously submitted a memorandum objecting to the project to Menteri Besar Muhammad Sanusi Md Nor. 

“The memorandum was signed by 900 residents, who have protested against the project many times.

,

ug610登陆www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

,

“This project was approved by the previous state government. This issue has been going, not just for one month but for many years,” he said when met after visiting the area affected by the floods and water surge phenomenon at Kampung Iboi, Baling today.

He also expressed sadness over the incident, which killed three people aged between 14 and 53, including a four-month pregnant woman. 

“I have said in Parliament six months ago, we need RM300 million to resolve the flood problem in Baling. I have repeatedly appealed, including to the Environment and Water Ministry, and now something terrible happens,” he said.

Meanwhile, Sanusi in a press conference today said the allegation that the musang king durian planting project in Gunung Inas is the cause of the incident has not been confirmed. – Bernama, July 5, 2022.


转载说明:本文转载自Sunbet。

  • 评论列表:

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。